• 3-Phase Current Transformer Temperature-Rise Testing System
  • 3-Phase Current Transformer Temperature-Rise Testing System

3-Phase Current Transformer Temperature-Rise Testing System

After-sales Service: on Site Debugging and Training
Warranty: 1.5 Years
System Usage: Three-Phase Current Transformer Temperature-Rise T
Max.Output Current: AC 4000A/Phase
Operation Model: Continuous Operation
Rated Capacity: 3X30kVA
Customization:
Gold Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
HES3-30
Output Model of The High-Current
Fixed Terminal Output
Time Control Function
Provided
Control Model
Automatic Adjustment by PC
Cooling
Forced Air Cooling
Input Cables
From Power Grid to Hes3-30
Output Cables
From Hes3-30 to Slq3-20/4
Transport Package
Standard Pakcing
Specification
Testing System
Trademark
Senerge
Origin
Zhejiang
Production Capacity
30 Sets/Month

Product Description

The brief Introduction of Transformer temperature rise testing system
In order to verify that Current Transformers will be able to handle the stresses in the networks in which they will be installed,
a series of socalled type tests are performed. Among these type tests is the Temperature Rise Testing, which is used to validate
 the Current Transformer's ability to withstand a rated temperature within an operating timeframe.

 
System Usage: Three-Phase Current Transformer Temperature-Rise Testing
Max.Output Current: AC 4000A/Phase
Operation Model: Continuous operation
Power Supply: AC 3x380V±10%, 50Hz
Rated Capacity: 3x30kVA
Control Model of the Testing Power:
  1. Automatic adjustment by PC
  2. Manual adjustment
Output Model of the High-Current: Fixed Terminal Output
Time Control Function: Provided
  
Input Votlage: AC 3x(0-380V), 50Hz
Rated Capacity: 30kVA/Phase

Output Model of the High-Current:
  1. When P2 and C1 in series connection, the output terminal is P1 and C2, the output voltage is 10V, the output current is 2000A
  2. When P1 and C1 in parallel connection, and P2 and C2 in parallel connection, the output terminal is P1 (C1) and P2 (C2), the output voltage is 5V, the output current is 4000A

Product structure:
  1. Stainless steel box
  2. Provide the movable roller at the bottom of the equipment
  3. Provide the hoisting ring on the top of the equipment
3-Phase Current Transformer Temperature-Rise Testing System3-Phase Current Transformer Temperature-Rise Testing System

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now